THE HOME OFFICE, UK Border Agency

Requirements

Lakeside Demountable Aluminium Flood Barriers;
Lakeside Slimline Demountable Aluminium Flood Barriers
Flood Barrier Accessories

Bespoke project features

The barriers have been utilised in the last flood.
On the 20th February 2022 the water reached 450mm above finished floor level and the building remained dry and operational

Installation date

February 2022.