Proyectos Destacados

  • PUB, Singapore’s National Water Agency

    A statutory board under the Ministry of Sustainability and the Environment (MSE)

    Requirements

    Detailed design of the flood barrier system

    Overview

    PUB is a statutory board under the Ministry of Sustainability and the Environment (MSE). It is the national water agency, which manages Singapore’s water supply, water catchment, and used water in an integrated way.

    Installation dates

    April 2023

  • Leicestershire County Council

    Property Flood Resilience Scheme

    Requirements

    Complete end-to-end management of the PFR Scheme covering Survey, Detailed Design, Manufacture, Installation, Commissioning and Handover.

    Overview

    Lakeside have increased the flood resilience to 22no. properties as part of the scheme, providing end-to-end support for Homeowners and guidance through the grant funding process.

    Installation dates

    March 2022 – June 2023

  • BT

    Lakeside selected to protect 15no. BT utility sites nationwide.

    Requirements

    The bespoke defences required include:

    • Demountable Aluminium Flood Barriers
    • Steel Flood Defence Doors
    • Stainless Steel Flood Gates
    • Stainless Steel Flood Defence Escape Hatches

    Overview

    Lakeside has been appointed as a sub-contractor to MJ Quinn to carry out the design, supply and installation of flood defences to 15no. BT utility sites nationwide.

    Each site has bespoke protection requirements and, subsequently, bespoke design and manufacture demands.

    Installation dates

    March – December 2022

  • THE HOME OFFICE, UK Border Agency

    Requirements

    Lakeside Demountable Aluminium Flood Barriers;
    Lakeside Slimline Demountable Aluminium Flood Barriers
    Flood Barrier Accessories

    Bespoke project features

    The barriers have been utilised in the last flood.
    On the 20th February 2022 the water reached 450mm above finished floor level and the building remained dry and operational

    Installation date

    February 2022.

  • Kendal Business Park, Kendal

    Requirements

    Lakeside Demountable Aluminium Flood Barriers, Ancillary Sewage Defence & Brick Defence Measures.

    Bespoke project features

    Rapid turnaround with surveys conducted within one working week from enquiry, extensive stakeholder management between Consultant, Client & Tenants.

    Installation date

    September 2017.

  • McCarthy & Stone

    Retirement Living Development, Harbour Road, Gosport, Hampshire UK

    Requirements

    2 Lakeside Demountable Aluminium Flood Barriers, 1800mm H.

    Bespoke project features

    CAD drawings; project meeting attendance from design phase; product samples and technical advice.

    Installation date

    September 2017.

     

  • Sowerby Bridge Business Park

    Requirements

    Lakeside Demountable Aluminium Flood Barriers, Ancillary Sewage Defence & Brick Defence Measures.

    Bespoke project features

    Large scale installation with 34no. Flood Barriers, dye test to drains, bespoke sealed manhole covers.

    Installation date

    September 2017.

  • Luxury Marina Development, Ocean Village, Southampton

    Requirements

    9 Lakeside Demountable Aluminium Flood Barriers, 300 – 900mm H.

    Bespoke project features

    Bespoke cover plates; storage racks with accompanying Installation Reminder Sign.

    Installation date

    August 2017.

     

  • Fremlin Walk, Maidstone Kent

    Requirements

    Lakeside Demountable Aluminium Flood Barrier System, 900mm – 1200mm H.

    Bespoke project features

    Bespoke steel ramps to car park openings, required
    due to high frequency of vehicle traffic, Demountable system allowing adjustable height, Lockable top pressing clamps, ensuring barriers can be locked into place once system is deployed and more…

    Installation date

    January 2017.

  • CBRE/Malcolm Hollis/Ramboll

    Fremlin Walk Shopping Centre, Maidstone, Kent UK

    Requirements

    Lakeside Demountable aluminium Flood Barriers, 900mm and 1200mm H.

    Project features

    Daily, efficient project management due to large scale of the project in bad weather conditions; bespoke steel ramps to car park openings due to traffic frequency and colour-coded stock itemisation.

    Installation date

    January 2017.

  • Ace, Sandbanks, Poole

    Requirements

    Lakeside Demountable Aluminium Flood Barrier System, 900mm – 1500mm H.

    Bespoke project features

    Vertical wall-mounted storage units, Concealment of side
    posts within cladding, Joint inter-company working with both Architect and Main Contractor

    Installation date

    December 2016.

  • David James Architects/Colmar Construction

    ACE Sandbanks 17-21 Banks Road, Sandbanks UK

    Requirements

    5 Lakeside Demountable aluminium Flood Barriers, between 900mm and 1500mm H.

    Bespoke project features

    CAD drawings; project meeting attendance from design phase; product samples and technical advice.

    Installation date

    December 2016.

     

  • Ford, Hamnton Environmental Services

    Requirements

    Lakeside Demountable aluminium Flood Barriers, 900mm H.

    Bespoke project features

    High agility and efficiency for installation in conditions of rising flood water.

    Installation date

    December 2016.

     

  • Bath Rugby

    Requirements

    Lakeside Demountable Aluminium Flood Barriers, 600mm and 900mm H.

    Bespoke project features

    Bespoke L-shape perimeter barrier.

    Installation date

    December 2016.

     

  • Sowerby Bridge Industrial Units, Calderdale

    Requirements

    Lakeside Demountable Aluminium Flood Barriers, Ancillary Sewage Defence Measures.

    Bespoke project features

    Extensive storage racking facilities, staff training support.

    Installation date

    December 2016.

  • Oxford University, UK Bio Centre

    Requirements

    Lakeside Demountable aluminium Flood Barriers, 600mm H; Vent Covers.

    Bespoke project features

    Bespoke perimeter barrier system and bespoke vent cover.

    Installation date

    October 2016.

     

  • PWP Architects/Soho House

    PWP Architects/Soho House, Confidential Client UK

    Requirements

    Various 1.5m H and 900mm H barriers.

    Supporting Information Provided

    Initial site meeting and survey, product demonstration, bespoke ground works, bespoke pressing clamps and bespoke lockable cover plates for side posts.

    Installation date

    January 2016.

     

  • Kier

    Requirements

    2 Lakeside Demountable aluminium Flood Barriers, 2400mm H.

    Bespoke project features

    Project meeting attendance; product demonstration and bespoke ground works.

    Installation date

    July 2015.