Empresas de Construcción

Trabajamos con constructores para garantizar una protección óptima anti-inundaciones.

Es fundamental nuestra intervención durante la fase de licitación y diseño del proyecto. Esto mejora la calidad del proyecto de construcción y lo hará mas competitivo.

Ofrecemos soluciones a medida durante la fase de licitación y diseño del proyecto.

La intervención en la fase de diseño de construcciones facilita un impacto mínimo en la estética de la construcción.

Related Case Studies

  • THE HOME OFFICE, UK Border Agency

    Requirements

    Lakeside Demountable Aluminium Flood Barriers;
    Lakeside Slimline Demountable Aluminium Flood Barriers
    Flood Barrier Accessories

    Bespoke project features

    The barriers have been utilised in the last flood.
    On the 20th February 2022 the water reached 450mm above finished floor level and the building remained dry and operational

    Installation date

    February 2022.

  • Ace, Sandbanks, Poole

    Requirements

    Lakeside Demountable Aluminium Flood Barrier System, 900mm – 1500mm H.

    Bespoke project features

    Vertical wall-mounted storage units, Concealment of side
    posts within cladding, Joint inter-company working with both Architect and Main Contractor

    Installation date

    December 2016.

  • Fremlin Walk, Maidstone Kent

    Requirements

    Lakeside Demountable Aluminium Flood Barrier System, 900mm – 1200mm H.

    Bespoke project features

    Bespoke steel ramps to car park openings, required
    due to high frequency of vehicle traffic, Demountable system allowing adjustable height, Lockable top pressing clamps, ensuring barriers can be locked into place once system is deployed and more…

    Installation date

    January 2017.

  • Kier

    Requirements

    2 Lakeside Demountable aluminium Flood Barriers, 2400mm H.

    Bespoke project features

    Project meeting attendance; product demonstration and bespoke ground works.

    Installation date

    July 2015.

     

  • Luxury Marina Development, Ocean Village, Southampton

    Requirements

    9 Lakeside Demountable Aluminium Flood Barriers, 300 – 900mm H.

    Bespoke project features

    Bespoke cover plates; storage racks with accompanying Installation Reminder Sign.

    Installation date

    August 2017.

     

  • McCarthy & Stone

    Retirement Living Development, Harbour Road, Gosport, Hampshire UK

    Requirements

    2 Lakeside Demountable Aluminium Flood Barriers, 1800mm H.

    Bespoke project features

    CAD drawings; project meeting attendance from design phase; product samples and technical advice.

    Installation date

    September 2017.

     

  • PWP Architects/Soho House

    PWP Architects/Soho House, Confidential Client UK

    Requirements

    Various 1.5m H and 900mm H barriers.

    Supporting Information Provided

    Initial site meeting and survey, product demonstration, bespoke ground works, bespoke pressing clamps and bespoke lockable cover plates for side posts.

    Installation date

    January 2016.

     